UPLAND, Ind. (AP): The launch of a small satellite designed and built by Taylor University engineering students has been delayed at least two weeks. California-based SpaceX pushed the launch back at least two weeks. They say it needs more time for launch preparations. SpaceX's rocket will carry into orbit a so-called nanosatellite that weighs less than three pounds.
previous post